|
[Construction of Type-B (16 Nos) of Residence at Mehnagar Thana in District-Azmgarh (U.P.)] [35/UPPCL/GM-1/2026-27/E-TENDER Dated-22.06.2026][2026_UPPRC_1162961_1]
U.P. Projects Corporation Ltd.
|
UPPCL |
construction |
UP eTender |
β |
06 Jul 2026, 02:00 PM 3d left |
|
[For the appointment of Third Party Inspecting Agency for site inspection for quality assurance/sample testing during Pre-Dispatch Inspection of 33/11KV, 10MVA Power Transformers at the works of manufacturers] [PVVNL- MT/MM/17(s)/26-27][2026_PVVNL_1158260_1]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 02:00 PM 3d left |
|
[Special MR for Various Type of Residences Water supply Pipeline and Drainage works in Hydel Colony at 132 KV SS Robertsganj Sonebhadra] [18/ECTC,PRG/2026-27][2026_UPCTL_1159440_1]
UP Power Transmission Corp.Ltd (Works and Projects))
|
UPPCL |
electrical |
UP eTender |
Rs. 0 |
06 Jul 2026, 02:00 PM 3d left |
|
[44/SE(TECH)/JZ/2026-27 ] [44/SE(TECH)/JZ/2026-27][2026_MVVNL_1160318_2]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
Rs. 6 |
06 Jul 2026, 02:00 PM 3d left |
|
[Running Contract for maintenance of Digital, Numerical and Mechanical Relay and Testing of VCB in jurisdiction of ETD Baghpat] [40/2026-27/EDC-BAGHPAT][2026_PVVNL_1160222_2]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 02:00 PM 3d left |
|
[Interior work, Furniture, and audio video work at New office food and Drug Commissioner Lucknow (U.P.)] [41/UPPCL/GM-7/E-TENDER/2026-27 Dated-16.05.2026][2026_UPPRC_1153248_2]
U.P. Projects Corporation Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 02:00 PM 3d left |
|
[Civil works for Construction of 01 No. 33 KV Gopalpur-II Bay at 220 KV S/S Sikandrabad, Bulandsahar.] [Short Term E-Tender Notice 11/2026-27 Sl No-20/2026-27][2026_UPCTL_1162208_1]
UP Power Transmission Corp.Ltd (Works and Projects))
|
UPPCL |
constructionelectrical |
UP eTender |
Rs. 0 |
06 Jul 2026, 02:00 PM 3d left |
|
[Installation of Tube well Boring Related Water Supply Works at 132 KV SS Saidpur District Ghazipur] [17/ECTC,PRG/2026-27][2026_UPCTL_1159437_1]
UP Power Transmission Corp.Ltd (Works and Projects))
|
UPPCL |
electrical |
UP eTender |
Rs. 0 |
06 Jul 2026, 02:00 PM 3d left |
|
[Civil work for increasing capacity from (3X63) MVA to (4x63) MVA Transformer at 220/132/33KV Substation Dadri.] [Short Term E-Tender Notice 11/2026-27 Sl No-18/2026-27][2026_UPCTL_1162180_1]
UP Power Transmission Corp.Ltd (Works and Projects))
|
UPPCL |
constructionelectrical |
UP eTender |
Rs. 0 |
06 Jul 2026, 02:00 PM 3d left |
|
[Work] [T-02/2026-27][2026_UPTCL_1157967_2]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 02:45 PM 3d left |
|
[ELECTRICAL WORKS] [TENDER NO. 25/EDCR-II,R/2026-27][2026_MVVNL_1164518_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[ELECTRICAL WORKS] [TENDER NO. 24/EDCR-II,R/2026-27][2026_MVVNL_1164478_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[16/EDCB/2026-27] [16/EDCB/2026-27][2026_MVVNL_1156654_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[22/EDCB/2026-27 ] [22/EDCB/2026-27][2026_MVVNL_1156704_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[20/EDCB/2026-27] [20/EDCB/2026-27][2026_MVVNL_1156694_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[21/EDCB/2026-27] [21/EDCB/2026-27][2026_MVVNL_1156699_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[Temporary Shifting of LT over head line from Chauk Thana T/F to Gudari T/F to Seva sadan T/F Daal mandi for road widening work by PWD, Varanasi] [14/UEDC-II(V)/2026-27][2026_PVVNV_1165418_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
construction |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[15/EDCB/2026-27] [15/EDCB/2026-27][2026_MVVNL_1156649_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[19/EDCB/2026-27 ] [19/EDCB/2026-27][2026_MVVNL_1156669_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[17/EDCB/2026-27 ] [17/EDCB/2026-27][2026_MVVNL_1156658_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[18/EDCB/2026-27] [18/EDCB/2026-27][2026_MVVNL_1156663_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[Supply, Installation, Testing and Commissioning of Passenger Lift at Transit Hostel for Commercial Tax Office, District-Barabanki] [08/UPPCL/PM-14/2026-27 Date 08/06/2026][2026_UPPRC_1158749_2]
U.P. Projects Corporation Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[CONSTRUCTION OF BALACE WORK GODOWN (200 MT ) AT MOHANLALGANJ, LUCKNOW] [07/UPPCL/PM-14/2026-27 Date 04/06/2026][2026_UPPRC_1157470_2]
U.P. Projects Corporation Ltd.
|
UPPCL |
construction |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[ELECTRICAL WORKS] [TENDER NO. 26/EDCR-II,R/2026-27][2026_MVVNL_1164543_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:00 PM 3d left |
|
[ELECTRICAL WORKS] [TENDER NO. 16/EDCR-II,R/2026-27][2026_MVVNL_1156192_2]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 03:45 PM 3d left |
|
[17/ECC(D)Ag/2026-27 ] [17/ECC(D)Ag/2026-27][2026_DVVNL_1149505_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[16/ECC(D)Ag/2026-27] [16/ECC(D)Ag/2026-27][2026_DVVNL_1149089_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[Maintenance of computers installed in of EDC Kopaganj, supply of stationery related materials and other necessary works] [19/EDC(M)/2026-27][2026_PVVNV_1154050_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[46/ECC(D)Ag/2026-27] [46/ECC(D)Ag/2026-27][2026_DVVNL_1154246_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[20/ECC(D)Ag/2026-27] [20/ECC(D)Ag/2026-27][2026_DVVNL_1149573_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[Providing Stationary and other ralated work EDD Mau] [25/EDC(M)/2026-27][2026_PVVNV_1160460_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[24/ECC(D)Ag/2026-27] [24/ECC(D)Ag/2026-27][2026_DVVNL_1149640_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[Maintenance and repair work for Tailless unit installed under various schemes to protect distribution transformers from damage under EDD Mau] [26/EDC(M)/2026-27][2026_PVVNV_1161656_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[SALE OF DRY FLY ASH FROM SILO OF 1X660 MW, PANKI THERMAL] [19 /PTEP/CMC/CMD-I/2025-26][2026_RVUNL_1119451_1]
UP Rajya Vidyut Utpadan Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[126/ECC(D)Ag/2026-27] [126/ECC(D)Ag/2026-27][2026_DVVNL_1156444_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[29/ECC(D)Ag/2026-27 ] [29/ECC(D)Ag/2026-27][2026_DVVNL_1155909_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[111/ECC(D)Ag/2026-27] [111/ECC(D)Ag/2026-27][2026_DVVNL_1155881_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[30/ECC(D)Ag/2026-27] [30/ECC(D)Ag/2026-27][2026_DVVNL_1155910_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[PREPARING PAINTING OF PALE FENCING AT UNDER ETD-II GORAKHPUR. ] [10-ETD-II(G)/2026-27][2026_UPTCL_1161515_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
fencing |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[35/ECC(D)Ag/2026-27] [35/ECC(D)Ag/2026-27][2026_DVVNL_1155927_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[100/ECC(D)Ag/2026-27] [100/ECC(D)Ag/2026-27][2026_DVVNL_1155828_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[PREPARING OF TRANSFORMER COOLING AT 220 KV SS BARAHUWA GORAKHPUR UNDER ETD-II GORAKHPUR. ] [08-ETD-II(G)/2026-27][2026_UPTCL_1161431_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[Work] [Short E-Tender No.-29/ETC-I(L)/2026-27][2026_UPTCL_1163622_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[PROVIDING AND FIXING OF TRIP CIRCUIT SUPERVISION RELAY ON C and R PANEL OF 40MVA TRANSFORMER REPLACEMENT OF 33KV ISOLATORS AND PAINTING AT 132KV SUBSTATION ANANDNAGAR UNDER ETD-II GORAKHPUR. ] [05-ETD-II(G)/2026-27][2026_UPTCL_1160750_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[REPLACEMENT OF 02 NOS. 122KV CONTROL PANEL AT 132KV SUBSTATION ANANDNAGAR AND CARRIAGE OF 145 KV SF 6 CIRCUIT BREAKER, ISOLATOR AT 132KB SUBSTATION MAHARAJGANJ UNDER ETD-II GORAKHPUR. ] [09-ETD-II(G)/2026-27][2026_UPTCL_1161440_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[CENTRIFUGING WORK OF TRANSFORMER OIL AND REPLACEMENT OF MOG OF 132 33 KV 63 MVA TF-II AT 220 KV SS BARAHUWA GORAKHPUR UNDER ETD-II GORAKHPUR. ] [07-ETD-II(G)/2026-27][2026_UPTCL_1161368_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[18/ECC(D)Ag/2026-27] [18/ECC(D)Ag/2026-27][2026_DVVNL_1149532_2]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[Shifting Work of the 33/11 KV SS Baxipur old and Construction of 33/11 KV new SS Baxipur under the Heritage corridor road widening Distt Gorakhpur] [39/EWC(G)/2026-27][2026_PVVNV_1164149_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
constructionelectrical |
UP eTender |
β |
06 Jul 2026, 04:00 PM 3d left |
|
[10/EDC(G)/2026-27] [NVS-05-14/EDC(G)/2026-27][2026_MVVNL_1153351_6]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 05:00 PM 3d left |
|
[11/EDC(G)/2026-27] [NVS-05-14/EDC(G)/2026-27][2026_MVVNL_1153351_7]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 05:00 PM 3d left |