|
[Installation, Erection and Commissioning of 02 No. of 63MVA and Dismantling of 02 No. of 40MVA 132-33 KV Transformers at 220KV SS Dunara Under ETD Jhansi] [ETS-05/ETCJ/2026-27][2026_UPTCL_1160798_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[Miscellaneous work for Smooth Operating of office of the Chief Engineer (D), Prayagraj-1, Prayagraj.] [10/EUDC-II/Pra/SE/2026-27][2026_PVVNV_1164092_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[ELECTRIC WORK] [T-80/EDC-I/B/2025-26][2026_PVVNL_1160008_1]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[Supply of various Stationary Item required for office of the Chief Engineer (D), Prayagraj-1, Prayagraj. ] [11/EUDC-II/Pra/SE/2026-27][2026_PVVNV_1164102_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[SITC of PAC] [57/P/AC/2026-27][2026_UPTCL_1164496_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
supply |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[ELECTRIC WORK] [T-28/EDC-I/B/2026-27][2026_PVVNL_1164118_1]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 11:00 AM 3d left |
|
[Under District Lucknow, Construction Of New Revenue Archives At The Vacant Site Of Collectorate Building, Lot No 1] [33/SE RED Lucknow/Lucknow/26-27 Dt 02/04/2026][2026_REDUP_1163555_1]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Under District Raebareli, Mainetnance of Culvert on Nala at Block Unchaharfrom Khanari to Kaluani, Lot No 1] [150/SE RED Lucknow/Raebareli/26-27 Dt 20/04/2026][2026_REDUP_1148422_1]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Gram Panchayat Jalihapur Interlinking road construction work from Jaswant Diwakar door in Jhinjhak development block to Kali Mata temple via Bhuiyavanri Mata temple.] [522/SERED/26-27 DT-15.06.26][2026_REDUP_1163653_1]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Separation of 33 Kv line of District Hospital and Mahila Hospital from 33 KV link line Malviya road] [06/EWC(B)/2026-27][2026_PVVNV_1155260_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD AND DRAIN FROM HOUSE NO. A188 VIA ROHIT SINGH HOUSE TO PANI KI TANKI PARK AT TAJNAGARI PHASE-2, AGRA.] [13/MLC/AGRA/26-27][2026_SCIDC_1164818_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD AND DRAIN FROM HOUSE NO. 4/425 TO KHOA MANDI AT BALUGANJ, AGRA.] [12/MLC/AGRA/26-27][2026_SCIDC_1164814_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF CC ROAD FROM RBS KIDS SCHOOL TO PARK AT TAJNAGARI PHASE-2, AGRA.] [08/MLC/AGRA/26-27][2026_SCIDC_1164800_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM GANGA FOJDAR KHET TO TOWARDS OF CHAMAD MAIYA MANDIR, VILLAGE-KHARBA, BLOCK- RAYA, MATHURA.] [12/MLC/MATHURA/26-27][2026_SCIDC_1158223_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM BRAJ MOHAN SINGH HOUSE TO TOWARDS OF MEER MINOR, VILLAGE- KHARBA, BLOCK- RAYA, MATHURA.] [13/MLC/MATHURA/26-27][2026_SCIDC_1158227_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[INSTALLATION OF A PIPELINE AND 20 HP MOTOR FOR WATER DRAINAGE FROM THE SMALL POND TO THE LARGE POND IN THE VILLAGE- BIRJUGARHI, BLOCK- NAUHJHIL, MATHURA.] [14/MLC/MATHURA/26-27][2026_SCIDC_1158231_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Construction of Additional Class Room, MDM Shed and Guard Room at Composite School Village Narokhar, Block Chatra, District- Sonebhadra ] [04/Tender/EE/SON/2026-27 Date 27.06.2026][2026_SCIDC_1164702_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Construction of Guard Room at Composite Primary School Village Bahuaara, Block Robertsganj, District- Sonebhadra ] [04/Tender/EE/SON/2026-27 Date 27.06.2026][2026_SCIDC_1164705_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF CC ROAD FROM ANUPAM PANDIT HOUSE TO RADHESHYAM HOUSE AT NAGLA KACHHIYAN, MUSTAFA QUARTER, AGRA.] [10/MLC/AGRA/26-27][2026_SCIDC_1164807_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[ELECTRICAL WORK] [42/EDC-I,R/2026-27][2026_MVVNL_1163235_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
constructionelectrical |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM PUSHPRAJ HOUSE TO SHIV MANDIR IN VILLAGE- SIKANDARPUR, BLOCK- MANT, MATHURA.] [04/MLC/MATHURA/26-27][2026_SCIDC_1158168_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[24/W/EDC II/SRE/2026-27] [24/W/EDC II/SRE/2026-27][2026_PVVNL_1163929_1]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Gram kaidhi mein Krishna nadi par kabristaan ke saamne rapta and cc sadak nirmaan karya] [186/RED/TENDER/ACCONTS/FILE NO-76/2026-27 DT 02-06-2026][2026_REDUP_1164725_1]
Director Cum Chief Engineer RED
|
RES |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Jalalabad mein Krishna nadi umarpur road kale waale ghaat par rapta and cc sadak nirmaan karya] [186/RED/TENDER/ACCONTS/FILE NO-76/2026-27 DT 02-06-2026][2026_REDUP_1164725_2]
Director Cum Chief Engineer RED
|
RES |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[21/W/EDC II/SRE/2026-27] [21/W/EDC II/SRE/2026-27][2026_PVVNL_1163897_1]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Ward.18 Zone.03A Road construction work from Kidwai Nagar Police Station turn via Subhash School to Vandy Chowraha Canal Track] [566/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 19.06.2026][2026_REDUP_1165021_2]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Construction of interlinking road and drain from Gyanendra Sachan plot to Gosain Baba Temple in Tikwanpur village of Ghatampur block] [566/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 19.06.2026][2026_REDUP_1165021_1]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM GANESHI MUKDAM HOUSE TO TOWARDS OF AACHARI HOUSE IN JATAV BASTI, VILLAGE- JARELIYA (HASANPUR), BLOCK- NAUHJHIL, MATHURA.] [10/MLC/MATHURA/26-27][2026_SCIDC_1158212_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Ward 18, Zone 03A Construction of road and footpath using Hot Mix from Gulmohar School Crossing to the Canal Embankment] [566/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 19.06.2026][2026_REDUP_1165021_3]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Ward.18 Zone. 03A Road construction work from Society Motors to Vinu Shukla Petrol Pump] [566/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 19.06.2026][2026_REDUP_1165021_4]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Ward 14 Zone 03A Road construction work from next to Gupta Saluja Petrol Pump to Agarwal Nut Bolt Factory] [566/RED/Tender/TVY 25-26(KANPUR NAGAR)/bond clerk /2026-27 DT 19.06.2026][2026_REDUP_1165021_5]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Running Contract of VCB Reparing under EDD2 Baraut] [39/2026-27/EDC-BAGHPAT][2026_PVVNL_1160168_2]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[REPLACEMENT OF DAMAGED POLE 11KV OR LT LINE IN UNFORESEEN CIRCUMSTANCE IN EUDD 11KV EXPRESSWAY NOIDA] [33/EUDC-T/2026-27/NOIDA (WORKS)][2026_PVVNL_1161647_2]
Paschimanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM BALVEER HOUSE TO TOWARDS OF JUNIOR SCHOOL, VILLAGE- LALPUR (MAHAVAN), BLOCK MANT, MATHURA.] [07/MLC/MATHURA/26-27][2026_SCIDC_1158200_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[02-EDC(A)/2026-27 ] [02-EDC(A)/2026-27][2026_MVVNL_1145809_2]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[01-EDC(A)/2026-27] [01-EDC(A)/2026-27][2026_MVVNL_1145738_2]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[03-EDC(A)/2026-27] [03-EDC(A)/2026-27][2026_MVVNL_1147287_2]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF BOUNDARY WALL AND INTERLOCKING WORK IN THE COURTYARD OF DAUJI TEMPLE LOCATED IN NAGLA LEKHA, BLOCK- RAYA, MATHURA, U.P.] [16/MLC/MATHURA/26-27][2026_SCIDC_1158237_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
fencingconstruction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF C.C. ROAD FROM SERVICE ROAD OF YAMUNA EXPRESSWAY TO JHAJJAR (KRIPAL SINGH HOUSE) VILLAGE- JHAJJAR, BLOCK- MANT, MATHURA.] [06/MLC/MATHURA/26-27][2026_SCIDC_1158190_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING WORK AT SHAMSHAN IN VILLAGE- GHASIYA GARHI, BLOCK- NAUHJHIL, MATHURA.] [08/MLC/MATHURA/26-27][2026_SCIDC_1158206_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[ Construction of C type tower at Bhitaria pump canal on rapti rever crossing for 33 kv line khantara emanation from 132 33 kv ss dumariyaganj siddharthngar and construction of C type tower in 33 kv line rewa on rapti crossing near village pachaus] [10/EWC(B)/2026-27][2026_PVVNV_1155286_4]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
|
UPPCL |
constructionelectrical |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[CONSTRUCTION OF INTERLOCKING ROAD FROM SUREHS HOUSE TO TOWARDS OF JWALA PRASAD MANDIR, VILLAGE- JOGPURA, BLOCK- RAYA, MATHURA.] [11/MLC/MATHURA/26-27][2026_SCIDC_1158221_3]
U.P. State Construction and Infrastructure Development Corporation Ltd.
|
UPSIDC |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[36KV VCB replacement at 220KV Firozabad and 132KV Tundla ] [ET-04/ETD(F)/2026-27][2026_UPTCL_1161953_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Hot Spot Scanning of 765 KV Fatehabad-Lalitpur, CKT-I and II Transmission Lines ] [ET_20_ETC_A_26_27][2026_UPTCL_1163914_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[EDCH-15/2026-27] [EDCH-15/2026-27][2026_DVVNL_1159629_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[09/E.D.C.(G.)/2026-27] [09/E.D.C.(G.)/2026-27][2026_MVVNL_1147409_4]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[08/E.D.C.(G.)/2026-27 ] [08/E.D.C.(G.)/2026-27][2026_MVVNL_1147386_3]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Providing and fixing of differential protection relay] [ ET_21_ETC_A_26_27][2026_UPTCL_1163961_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[11/EDC(S)/2026-27] [11/EDC(S)/2026-27][2026_MVVNL_1163206_1]
Madhyanchal Vidyut Vitran Nigam Ltd
|
UPPCL |
β |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |
|
[Construction of an asphalt road from the Allipura-Kasam Sarai route towards Bori Bora ki Madhaiya.] [13/RED/NIT/2026-27 Dated 04.04.2026][2026_REDUP_1143455_1]
Director Cum Chief Engineer RED
|
RES |
construction |
UP eTender |
β |
06 Jul 2026, 12:00 PM 3d left |