| Tender | Department | Scopes | Portal | Value | Deadline (IST) |
|---|---|---|---|---|---|
|
[Work] [ET-08/ETC(M)/26-27][2026_UPTCL_1156778_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL | β | UP eTender | β | 02 Jul 2026, 01:00 PM |
|
[33 kv line growth center] [02/EWC(K)/2026-27][2026_DVVNL_1159670_1]
Dakshinanchal Vidyut Vitran Nigam Ltd.
|
UPPCL | electrical | UP eTender | β | 02 Jul 2026, 01:00 PM |
|
33/MyCSD2/AE/e-tender
Central Public Works Department (CPWD)
|
β | β | CPPP | β | 02 Jul 2026, 01:00 PM |
|
[Work] [ET-05/ETC(M)/26-27][2026_UPTCL_1140466_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL | β | UP eTender | β | 02 Jul 2026, 01:00 PM |
|
E24260005
Bharat Heavy Electricals Limited
|
β | β | CPPP | β | 02 Jul 2026, 01:15 PM |
|
Providing consultancy services for preparation of DPR including, design calculation for pavement with supporting FWD tests as applicable, and NSV report , CBR values etc. for work proposed under CRIF for the year 2026-27
Ministry of Road Transport and Highways
|
β | β | CPPP | β | 02 Jul 2026, 01:15 PM |
|
Supply of pedestal cap as per BHEL drawing
Bharat Heavy Electricals Limited
|
β | β | CPPP | β | 02 Jul 2026, 01:15 PM |
|
E27260005
Bharat Heavy Electricals Limited
|
β | β | CPPP | β | 02 Jul 2026, 01:15 PM |
|
E46260008 for SUPPLY, I and C OF TRFR OIL FILTERATION PLANT, OIL TRFR PUMP, REGENERATIVE AIR DRYER
Bharat Heavy Electricals Limited
|
β | β | CPPP | β | 02 Jul 2026, 01:15 PM |
|
[Providing consultancy services for preparation of DPR including, design calculation for pavement with supporting FWD tests as applicable, and NSV report , CBR values etc. for work proposed under CRIF for the year 2026-27] [EE/NHD/SMG/AE1/FWD/NIT3/2026][2026_MoRTH_914151_1]
Ministry of Road Transport and Highways
|
β | β | eProcure | β | 02 Jul 2026, 01:15 PM |
|
Fire Retardant vinyl coated upholstery
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Procurement of Supply, Installation and commissioning of multi operator welding sets with Bus Bar MAKE- SAGS or Similar.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
HOSE WATER
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
ANGE000174
Bharat Heavy Electricals Limited
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
power backup UPS
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Brake cylinder 355mm etc.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Striker Casting Wear Plate etc.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Rubber Profile as per RCFs Drg No
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
DOUBLE INLET CENTRIFUGAL
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Furosemide 20 mg + Spironolactone 50 mg TAB
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
SNACK TABLE ASSEMBLY FOR LHB
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Empagliflozin 25 mg TAB
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
NEW PROCUREMENT Must Change overhauling kit.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Temper check paste
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
PROCUREMENT OF SUPPLY, INSTALLATION AND COMMISIONING OF IOT BASED WATER LEVEL INDICATOR SYSTEM FOR LHB NON AC INDIAN RAILWAY PASSENGER COACHES
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
UNIVERSAL MODIFIED OVER VOLTAGE
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
CONNECTOR FOR RADAR
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Diclofenac gel 1 Percent tube of min 30 GM
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Inj. Quadrivalent Human Papillomavirus Vaccine [ ITEM CODEM230602] as per Specn. ITEM CODEM230602
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
cooking coil made out impo
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
EXHAUST FAN
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Providing consultancy services for preparation of DPR including, design calculation for pavement with supporting FWD tests as applicable, and NSV report , CBR values etc. for work proposed under CRIF for the year 2026-27
Ministry of Road Transport and Highways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
[Providing consultancy services for preparation of DPR including, design calculation for pavement with supporting FWD tests as applicable, and NSV report , CBR values etc. for work proposed under CRIF for the year 2026-27] [EE/NHD/smg/AE1/FWD/NIT6/2026][2026_MoRTH_914158_1]
Ministry of Road Transport and Highways
|
β | β | eProcure | β | 02 Jul 2026, 01:30 PM |
|
Axle Box Bearing
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Luggage rack complete (Prototype)
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
PRIMARY SUSPENSION SPRING
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
SECONDARY SUSPENSION SPRING
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Budesonide 160 mcg + Glycopyrronium 7.2 mcg + Formoterol Fumarate Dehydrate 5 mcg
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Axle Box Complete without Bearing
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Punching Chisel
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Direct On line Starter with 2 sets of 3 pole
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Kapton -polyimide film with adhesive 12 mm
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
COMPRESSOR OIL SERVO PRESS 100 RR FOR WDG4 LOCO.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Cab activating key switch
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
FRICTION ARM (L.H)FOR WAG7 LOCO, TO SPECN
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Brake Beam to RCF Drg.
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
SET OF CONTROL ARM SUPPORT
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Pressed Frame for lookout glass
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
COMMUTATOR ASSEMBLY OF HHP TRACTION
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |
|
Brake Support to RCF drg
Ministry of Railways
|
β | β | CPPP | β | 02 Jul 2026, 01:30 PM |