Vartulz Technologies Β· TenderAlerts

Tender Dashboard

Vinayak Builders & Suppliers β€” UP eTender Β· CPPP Β· eProcure Β· GeM
17,480
Total tenders
8,858
Relevant
1,918
Alert-worthy
834
Closing ≀ 7 days
236
Added today
Clear
TenderDepartmentScopesPortalValueDeadline (IST)
[Development and Beautification Work of Ramleela Ground at Khajani Distt. Gorakhpur] [18/GM-3/UPPCL/2026-27 DATE-12.06.2026][2026_UPPRC_1161223_2]
U.P. Projects Corporation Ltd.
UPPCL construction UP eTender β€” 08 Jul 2026, 03:00 PM 3d left
[Construction of new 33 KV line khempipra from new proposed SS khempipara Distt Maharajganj] [35/EWC(G)/2026-27][2026_PVVNV_1155067_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL constructionelectrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[Increasing capacity of Pali and Ranipur Distt Gorakhpur] [28/EWC(G)/2026-27][2026_PVVNV_1155481_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL β€” UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[LOPPING/CHOPPING AND TREE CUTTING IN THE CORRIDORE OF DIVERSION OF 132KV BANSI-NAUGARH LINE] [E-tender no.13-2026-27][2026_UPTCL_1164562_1]
UP Power Transmission Corp.Ltd (Operation)
UPPCL electrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[Construction of 1x5 MVA New Substation Hetimpur and related 33 KV and 11 KV line Distt Deoria] [07/EWC(G)/2026-27][2026_PVVNV_1155053_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL constructionelectrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[LOPPING/CHOPPING AND TREE CUTTING IN THE CORRIDORE OF DIVERSION OF 132KV BANSI-ITWA AND BASTI-DUMARIYAGANJ LINE] [E-tender no.12-2026-27][2026_UPTCL_1164560_1]
UP Power Transmission Corp.Ltd (Operation)
UPPCL electrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[Increasing capacity of Samardhira harpur tiwari paniyara maharajganj] [29/EWC(G)/2026-27][2026_PVVNV_1154913_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL β€” UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[PRILIMINARY ROUTE SURVEY FOR DIVERSION OF 132KV BANSI-ITWA AND BASTI-DUMARIYAGANJ LINE UNDER ETD-II BASTI (DEPOSIT SCHEME) DUE TO CONSTRUCTION OF RAILWAY LINE FROM BANSI TO BAHRAICH (PROPOSED)] [E-tender no.11-2026-27][2026_UPTCL_1158164_1]
UP Power Transmission Corp.Ltd (Operation)
UPPCL constructionelectrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[PROVIDING AND FIXING OF 150 W LED LIGHTS ALONGWITH OTHER ASSOCIATED WORKS AT 132KV S/S DUMARIYAGANJ AND 132KV S/S NAUGARH] [E-tender no.05-2026-27][2026_UPTCL_1153422_1]
UP Power Transmission Corp.Ltd (Operation)
UPPCL electrical UP eTender β€” 08 Jul 2026, 04:00 PM 3d left
[Construction of Govt. Higher Secondary school Shahpur dev Shahbad, Rampur (Library room)] [1409/M-18/335 Dated 03/06/2026][2026_UPCDS_1158728_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Higher Secondary school Shahpur dev Shahbad, Rampur (Biology laboratory)] [1406/M-18/332 Dated 03/06/2026][2026_UPCDS_1158666_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Higher secondary school Ahro bilaspur, Rampur (Library room)] [1412/M-18/338 Dated 03/06/2026][2026_UPCDS_1158784_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Girls inter College Swar, Rampur (Facility of Drinking water, Physics and Chemistry Laboratory) and Construction of Govt. inter College Swar, Rampur (Facility of Drinking water, Physics and Chemistry Laboratory, Biology labora] [1410/M-18/336 Dated 03/06/2026][2026_UPCDS_1158771_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Higher Secondary school Shahpur dev Shahbad, Rampur (Toilet blocks for boys and girls)] [1405/M-18/331 Dated 03/06/2026][2026_UPCDS_1158641_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Higher Secondary school Shahpur dev Shahbad, Rampur (Multipurpose Hall)] [1408/M-18/334 Dated 03/06/2026][2026_UPCDS_1158719_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction of Govt. Higher secondary school Ahro bilaspur, Rampur (Toilet blocks for boys and girls)] [1411/M-18/337 Dated 03/06/2026][2026_UPCDS_1158778_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 08 Jul 2026, 04:30 PM 3d left
[Construction work of Interlocking road and covered Nali at NP Martinganj Ward No 3 Atal Nagar Colony from house of Kamlesh to house of Kewalnath Gautam] [179/27][2026_SUDA_1164711_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of Interlocking road and covered Nali at NPP Azamgarh Ward No 4 Gulami ka Pura Colony from beside the Redrose School to Main Road] [179/22][2026_SUDA_1164706_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[57/EDCS/2026-27] [57/EDCS/2026-27][2026_MVVNL_1164739_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Increasing capacity of Tekuatar and Kasia Tehsil and related 11 KV line Dist Kushinagar] [32/EWC(G)/2026-27][2026_PVVNV_1155007_2]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[58/EDCS/2026-27] [58/EDCS/2026-27][2026_MVVNL_1164746_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[55/EDCS/2026-27] [55/EDCS/2026-27][2026_MVVNL_1164724_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[56/EDCS/2026-27] [56/EDCS/2026-27][2026_MVVNL_1164729_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Inter Locking and Nali At Gram Bamrauli Bakrabad me Dalit Malin Basti me kallu house to Roshan house] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_6]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Inter Locking and Nali At Gram Khedua Damar Road to CC Road ] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_1]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of Interlocking road and covered Nali at NPP Azamgarh Ward No 20 Raidopur Colony from house of Mukesh Kharwar to house of Manoj Singh Chaina] [179/49][2026_SUDA_1164737_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Inter Locking and Nali At Gram Ahamadpur Pavan me Nazim ke dukan se sharda house] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_2]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[05/CE(TSE)/2026-2027] [05/CE(TSE)/2026-2027][2026_UPTCL_1162807_1]
UP Power Transmission Corp.Ltd (Operation)
UPPCL β€” UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of Interlocking road at NP Martinganj Ward No 11 Malvia Nagar Colony from Subhash Ki Shop to Tarawon Baba Mandir] [179/28][2026_SUDA_1164714_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of CC road at NP Mahrajganj WN 4 Sant Ravidas Nagar Colony from Ashok Singh Shop to Ram Janki Temple] [179/14][2026_SUDA_1164698_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of CC road at NPP Bilariaganj WN 15 Bilariaganj Colony from Bilariaganj Main Road for front of Mukarram Hopital to house of Pappu Thokawa] [179/18][2026_SUDA_1164703_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Nali At Lal Bahadur Shastri Nagar side of Rajyans Nidhi Road] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_7]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of Interlocking road and covered Nali at NPP Azamgarh Ward No 4 Gulami Ka Pura Colony from Tidiya Masjid to Azad Park Tiraha] [179/46][2026_SUDA_1164728_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[54/EDCS/2026-27] [54/EDCS/2026-27][2026_MVVNL_1164719_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[59/EDCS/2026-27] [59/EDCS/2026-27][2026_MVVNL_1164749_1]
Madhyanchal Vidyut Vitran Nigam Ltd
UPPCL electrical UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Maintenance/ Upgradation of Roads at I.A. Talanagri Sector-1 Distt- Aligarh.] [CD_IV_73_DT_05062026][2026_SIDC_1161394_1]
UP STATE INDUSTRIAL DEVELOPMENT CORPORATION
UPSIDC construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Roads and P/L Interlocking tiles on Road Patries road no. 1, 2, 3, 6, 9, 11 and Service road at I.A. Surajpur Site-B and C Distt. G.B. Nagar.] [CD_II_72_DT_05062026][2026_SIDC_1161375_1]
UP STATE INDUSTRIAL DEVELOPMENT CORPORATION
UPSIDC construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of Interlocking road and covered Nali at NP Katghar Lalganj Ward No 10 Dindayal Nagar Colony from Vidya Devi Ka Plot to house of Siddharth Singh] [179/29][2026_SUDA_1164718_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Supply and Fixing of Facade light at entrance gate along with 3 years of AMC at IA Sumerpur, IA Raebareli Site-II and IA Panki Site-I] [ED_IV_25_12052026][2026_SIDC_1161645_1]
UP STATE INDUSTRIAL DEVELOPMENT CORPORATION
UPSIDC β€” UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction work of CC road at NP Mehnagar at WN 10 Harivansh nagar Colony from house of Pal Doctor to Vedi Maurya Plot] [179/40][2026_SUDA_1164722_1]
State Urban Development Agency
DUDA construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Road and Fatehpur Ghat me Sri Amit Kumar Mishra house to main marg tak] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_4]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Inter Locking and Nali At Bharetha Bhathha me kandhai house to prakash ke ghar to ram kripal house to Bharetha damar raod tak] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_5]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[Construction of Inter Locking and Nali At Rajrooppur me mini Tubweel se Sushil Mishra house to Ganesh Srivastava waali Gali and Agarwal Nagar Nigam house] [Notice No. 740 date 22-06-2026][2026_REDUP_1165972_3]
Director Cum Chief Engineer RED
RES construction UP eTender β€” 08 Jul 2026, 05:00 PM 3d left
[ Construction of Cement Concrete Road at p/o Kamlesh towards Kamakhya Devi Mandir, Vill-Biramai, Distt-Firozabad.] [395/EE3/AGRA/UPSIC/2026-27][2026_MSME_1166044_1]
Department of MSME And Export Promotion
UPSIC construction UP eTender β€” 08 Jul 2026, 06:00 PM 3d left
[Upgradation of Composite School Bhabhot Block Jaisinghpur Distt Sultanpur] [658/E E/Ayo/E-Tender/Composit School SUL/2026- 27 Dated 01.07.2026][2026_SCIDC_1165632_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 09:00 AM 4d left
[Construction of a 148.00 m CC tile road and drain from Kashiram Pradhan house to the Shiva temple in village Kazibehta, DISTRICT-SAMBHAL (MLA-NIDHI)] [018/E.E./SBL/NIDHI/2026-27 Dt. 02-07-2026][2026_SCIDC_1165739_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 10:00 AM 4d left
[Construction of a 141.00 m CC tile road and drain in Village Allipur Buzurg, extending from Rajkumar house to Vijayveer house and the primary school, DISTRICT-SAMBHAL (MLA-NIDHI)] [019/E.E./SBL/NIDHI/2026-27 Dt. 02-07-2026][2026_SCIDC_1165747_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 10:00 AM 4d left
[Construction of a CC tile road and drain (110.00 meters) in Gram Aata, extending from Mahipal Singh shop to Dr. Arvind house, DISTRICT-SAMBHAL (MLA-NIDHI)] [020/E.E./SBL/NIDHI/2026-27 Dt. 02-07-2026][2026_SCIDC_1165753_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 10:00 AM 4d left
[Construction of a 145.00 m CC tile road and drain from Brijnandan Prajapati house to Deviram Pal house in village Allipur Buzurg, DISTRICT-SAMBHAL (MLA-NIDHI)] [022/E.E./SBL/NIDHI/2026-27 Dt. 02-07-2026][2026_SCIDC_1165765_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 10:00 AM 4d left
[Construction of a 60.00 m CC tile road and drain in Gram Aata, extending from Rakhi house to the highway (Mamta Group), DISTRICT-SAMBHAL (MLA-NIDHI)] [021/E.E./SBL/NIDHI/2026-27 Dt. 02-07-2026][2026_SCIDC_1165759_1]
U.P. State Construction and Infrastructure Development Corporation Ltd.
UPSIDC construction UP eTender β€” 09 Jul 2026, 10:00 AM 4d left
⬇ Export Excel ⬇ CSV
1,918 matched Β· page 23 of 39 ← PrevNext β†’