Vartulz Technologies Β· TenderAlerts

Tender Dashboard

Vinayak Builders & Suppliers β€” UP eTender Β· CPPP Β· eProcure Β· GeM
9,165
Total tenders
5,096
Relevant
1,154
Alert-worthy
0
Closing ≀ 7 days
0
Added today
Clear
TenderDepartmentScopesPortalValueDeadline (IST)
[Construction of an RCC drain and a CC road in Ward No. 64, from Dr. Ahmad to Haji Majid.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_44]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in Ward No. 55 Baghdad Nagar, Lane No. 2 from Tau house to Shaukat Chaudhary house and in Nagla Kothi from Lalla house to Parvez house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_33]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of a CC road and repair of the drain in the lane of Ward No. 61, Madina Colony, stretching from Bablu house to Aslam Tar Wala house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_41]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Drain repair and CC road construction work in Ward No. 51 Lohiyan Wali Gali from Sadar Bazar Road via Pradeep Kumar to Digambar Jain Mandir, and from Sachin Verma to Ashok Jain and from Aamir to Manoj up to the intersection (Chowk).] [Re 05/PWD/2026-27][2026_DOLBU_1173536_31]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in Ward No. 58 Habibganj locality stretching from Istakar house to Bantantu house, and in Urdu Nagar from Shakeel house to Siraj house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_36]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Road improvement work in Ward No. 65 Mashroor Ganj drain repairs and the construction of a CC road on the stretch from Nado to Rosar Bhai house, from Kalu house to Evav house, and from Sursad to Asim house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_46]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in Ward No. 49 Moh. Sarai North from the house of Israr Ahmed alias Pappu to the Ek-Minar Wali Masjid.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_30]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in Ward No. 47, Kishan Nagar, from Shanu Rain place to the house of Gulfan/Aehjad Qureshi.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_29]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in Ward No. 60 Ajmeri Gate area, Akashvani Road extending from Dr. Ghulam Sabir house, via Qasim house, up to Haji Sahzad house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_40]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction work for drain repair and a CC road in Ward Nos. 57 and 59 Qadri Masjid Road area, spanning from Sabbir ki Taal to Rizwan Halwai shop.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_35]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in the unpaved lane of Ward No. 56, Urdu Nagar stretching from the Waris Pak Dargah, past Guddu place, up to Manju boundary wall.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_34]
Directorate of Local Bodies UP
β€” fencingconstruction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road from Virendra Yadav place to Hariom Gupta place in Ward No. 19, Kanhaiya Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_15]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in Ward No. 10, Kailash Nagar (Lane No. 8/4), stretching from Sonu house to Rakesh Dixit house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_12]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Road improvement work using CC and drain repair from Lane No. 2 Chhotelal lane to the Dharamshala and Kashiram and Narsingh Pal Singh, Suresh Chandra, Amrender Kumar Verma and Jagdish, Tarachand and Dharmendra in Ward No. 10, Nagla Karan Singh.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_10]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road from Rajveer house to Swapna Mallick house in Ward No. 1, Moh. Nagla Pipariya] [Re 05/PWD/2026-27][2026_DOLBU_1173536_8]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of RCC drains and CC roads from Noor Jahan to Sartaj, from Rasida to Dinesh factory, and from Salim in Ward No. 61, Madina Colony.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_7]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Drain repair and road improvement using CC in Ward No. 03, Jagdamba Nagar specifically on Lane No. 03 from Mahavir Singh Fauji house to Anil Master Ji house, and from Chintaharan School to Ashok Kumar house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_9]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of CC roads and RCC drains in Ward No. 55 Baghdad Nagar, Todo Wali Bagiya covering the stretch from Lalla Chakki to Bajruddin Lane No. 7, Faima Medical to Ashraf Lane No. 9, and Malik Babu to Qadeer house Lane No. 10.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_6]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Beautification work of the pond located in Hundawala Bagh, Ward No. 50.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_5]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Road improvement work involving the construction of an RCC drain and a CC road in Ward No. 47 (Mohalla Kishan Nagar), spanning the stretch from Daraju Kabadiwala place passing by Chanda Khan house Charewala placeup to Jagdish Yadav house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_4]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road from Rajendra field near the drain in Ward No. 29 to Guddu house, and from Manoj house to Ankit Fauji house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_3]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Beautification work of the pond located at Wajidpur Thar, Ward No. 25.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_2]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Beautification work of the pond in Ward No. 22, Ailani Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_1]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in the unpaved lane known as Udayjit-wali Gali located near the Peepal-wala Ground in Ward No. 36, Nagla Pachiya.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_25]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of a CC road and repair of drains in Ward No. 28 Humayupur II from Mahendra Rathore place to Rameshwar place, and from Jawahar Singh house to Chuchu place.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_22]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain from Ashok Kumar house to the Sant Nagar drain on Phulwadi Road, Ward No. 19.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_21]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in Ward No. 19, Sant Nagar from Premchandra property to Sarvesh Kumari property, near the Om Nagar culvert.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_20]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road from Pandit to Ramesh in the unpaved lane of Valmiki Basti, Ward No. 19, Kanhaiya Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_19]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road in the unpaved lane from Radheshyam Patanjali to Vikas in Ward No. 19, Kanhaiya Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_18]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain from Raju place to Sundarlal place in Ward No. 19, Kanhaiya Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_17]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in Ward No. 19, Om Nagar, extending from Bhure house to Bharat Singh house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_16]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and a CC road in Ward No. 19, Sant Nagar, stretching from the lane near Keshav Fauji house, past Chaudhary house, up to Radha house.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_14]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of an RCC drain and CC road from Vinod house to Prashant house in Ward No. 10, Kailash Nagar.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_11]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Construction of a drain and a CC road from Lane No. 08 (Kashiram) to the ancient Shankar Ji temple in Ward No. 14, Purana Rasulpur.] [Re 05/PWD/2026-27][2026_DOLBU_1173536_13]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[UPGRADATION AND INSTALLATION OF SMART CLASS AT UCCHATAR MADHAMIK VIDHYALAYA, KAKADEO AND A.N.D. COLLEGE.] [D/479/CE/2025-26][2026_NNKAN_1130732_4]
Kanpur Municipal Corporation, Kanpur, UP
β€” construction UP eTender β€” 07 Aug 2026, 03:00 PM
[Engineering, Procurement and Construction of Isotope Production Reactor (IPR) on EPC Mode-1 Basis] [BARC(V)/CES/IPR/EPC/208, Dated 06/01/2026][2026_BARC_893016_1]
Bhabha Atomic Research Centre
β€” construction eProcure β€” 07 Aug 2026, 03:30 PM
[Cont of Multipurpose Seed Store and Technology Dissemination Centre Hasanganj Lko] [1577/E-Tender/186 Dt. 06.07.2026][2026_UPCDS_1168636_1]
Construction and Design Services UP Jal Nigam
C&DS β€” UP eTender β€” 07 Aug 2026, 04:00 PM
[Annual Repair and Maintenance of Non Residential Building Civil for the year 2026 27 at 28 BN ITBP Jatusana Rewari] [ITBP/28BN/ENGR/2026-27/9846][2026_ITBP_917258_1]
DG, Indo-Tibetan Border Police Force
β€” construction eProcure β€” 07 Aug 2026, 04:00 PM
[Composite Works comprising of Piping, Mechanical, Electrical and Instrumentation Jobs for Interconnecting Piperack and Allied Areas of Lupech (J-18) Project, IOCL Gujarat Refinery, Vadodara, Gujarat] [BandR/HO/71139/Insulation Work-PKG-III/SC/01][2026_BandR_911834_1]
Bridge and Roof Company (India) Limited
β€” electrical eProcure β€” 07 Aug 2026, 04:00 PM
[Annual Repair and Maintenance of Residential Building Civil for the year 2026 27 at 28 BN ITBP Jatusana Rewari] [ITBP/28BN/ENGR/2026-27/9845][2026_ITBP_917369_1]
DG, Indo-Tibetan Border Police Force
β€” construction eProcure β€” 07 Aug 2026, 04:00 PM
[Cont of Multipurpose Seed Store and Technology Dissemination Centre at Block Nawabganj Unnao] [1578/E-Tender/187 Dt. 06-07-2026][2026_UPCDS_1168821_1]
Construction and Design Services UP Jal Nigam
C&DS β€” UP eTender β€” 07 Aug 2026, 04:00 PM
[Construction of Mulitipurpose Seed Store and Technology Dissemination Centre at Block SI Sirosi Unnao] [1576/E-Tender/185 Dt. 06.07.2026][2026_UPCDS_1168621_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 07 Aug 2026, 04:00 PM
[Wet Waste Proccessing Pit Composting Unit 05 TPD Civil Work ] [310/Npsirauli/2026-27][2026_DOLBU_1171981_1]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 04:00 PM
[Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Remodeling of Storm water Drain (Qila Mohammadi Nala) in Lucknow. ] [1447/G-10/403 dated 23.07.2026][2026_UPCDS_1171955_1]
Construction and Design Services UP Jal Nigam
C&DS construction UP eTender β€” 07 Aug 2026, 04:30 PM
[Construction of wall, railling Interloking tiles and open gym infront of Mathura Prasad house in Moh shiv vihar ward no-1 Rampur] [687/NPP/ET/RAMPUR/2026][2026_DOLBU_1171728_1]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 05:00 PM
[Civil rectification and strengthening work of control room building at 33/11 KV Substation-Lediyari Prayagraj] [69/2026-27/ECD(D)/PRAYAGRAJ.][2026_PVVNV_1171994_1]
Purvanchal Vidyut Vitran Nigam Limited Varanasi
UPPCL electrical UP eTender β€” 07 Aug 2026, 05:00 PM
[WARD NUMBER 02 MEIN MUKHYAMARG SE UMRAO PAL KE GHAR HOTE HUE RAM KUMAR KE GHAR TAK C C ROAD NIRMAN KARYA] [619/NPDHAKWA-2026 DATE- 23/06/2026][2026_DOLBU_1169128_1]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 05:00 PM
[Construction of RCC Nala from police chauki to labour colony in Moh jwala nagar ward no-4 Rampur] [687/NPP/ET/RAMPUR/2026][2026_DOLBU_1171459_15]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 05:00 PM
[Annual Operation and Maintenance of Central Air Condition work at KDA Main Office Building Ground First, Second, Thrd Floor and Auditorium.] [E-740334(E/M)][2026_UPKDA_1172269_1]
Kanpur Development Authority
β€” construction UP eTender β€” 07 Aug 2026, 05:00 PM
[Construction of Interlocking road and drain near ashok to rajeev and deepak in Moh kunda ward no-33/13 Rampur] [687/NPP/ET/RAMPUR/2026][2026_DOLBU_1171459_23]
Directorate of Local Bodies UP
β€” construction UP eTender β€” 07 Aug 2026, 05:00 PM
⬇ Export Excel ⬇ CSV
5,096 matched Β· page 54 of 102 ← PrevNext β†’