|
[Construction of CC flooring and drains in Jogipada (Azampada, Agra) spanning the stretch from Mansa house past Rajkumar house up to the Bagichi as well as in the lane leading to the Chamunda Devi temple and the lane known as Babita Wali Gali] [108/D/DUDA/26-27/07][2026_SUDA_1173236_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of a cement-concrete (CC) floor and a drain in Rajnagar Lohamandi, extending from the vicinity of house no. 17/147 (near the drain) past Pappu Gwalior house and Sunil bungalow, and via Dhanpal Singh house up to Vimala Meerut-wali] [108/D/DUDA/26-27/06][2026_SUDA_1173234_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of CC flooring and drains in Prakash Nagar, Shahganj, Agra specifically in Fakira Wali Gali, Satimahal Wali Gali, the stretch from Vishal house to Dr. Bengali house, and the link lanes of Ramkunj and Hamid Nagar.] [108/D/DUDA/26-27/08][2026_SUDA_1173238_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of a drain and CC road from the community toilet in Ward 2, Nagla Udeya, to Dinesh house.] [108/D/DUDA/26-27/09][2026_SUDA_1173539_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of a drain and CC road in Ward 4, extending from Salim house to the house of Salman (Gym owner).] [108/D/DUDA/26-27/10][2026_SUDA_1173544_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of CC flooring and drains in the lane with the Red Gate (Lal Darwaza), extending from Brijbhog Mishtan Bhandar in Mantola, Agra, to Syed Gali.] [108/D/DUDA/26-27/02][2026_SUDA_1173228_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of a drain and a CC road from Pramod house to the pond in Ward 2 (Khatik Pada) of Kheragarh Nagar Panchayat.] [108/D/DUDA/26-27/03][2026_SUDA_1173230_1]
State Urban Development Agency
|
DUDA |
construction |
UP eTender |
β |
27 Aug 2026, 06:00 PM |
|
[Construction of fire station at IMLC Unnao District Unnao] [4099/3985/UPEIDA/2026][2026_UPEID_1173354_1]
U.P. Expressways Industrial Development Authority
|
β |
construction |
UP eTender |
β |
28 Aug 2026, 12:30 PM |
|
[Consultancy Services for Authority Engineer for supervision of Widening to 4 Lane PS from Km 347.500 Intersection with NH 48 at Km 116.800, Near Sira to Km 367.700 Near Badavanahalli including bypass to Sira town of NH 69 in the state of Karnataka on] [RW/BNG/A.E./NH 69/Km.347.500-367.700/15/2026][2026_MoRTH_917370_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
28 Aug 2026, 03:00 PM |
|
[Consultancy services for preparation of DPR for Rehabilitation and Upgradation of existing road between km 0.00 to km 76.00 Bhairoghati Nelong Naga Sonam-PDA Medikey from existing/single lane to double lane with paved shoulder specification on road] [RO/UK/NH-134A/DPR/ Bhairoghati Nelong-Naga Sonam-PDA Medikey/2026-27 ][2026_MoRTH_917387_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
28 Aug 2026, 05:00 PM |
|
[Construction of balance of National Highway353J Morshi Chandurbazar Achalpur including ROB construction on EPC mode in the state of Maharashtra] [03/EENH/AMT/2026-27, Dt.15.07.2026][2026_MoRTH_917615_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
28 Aug 2026, 05:30 PM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN VILLAGE SADIMADANPUR BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_1]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN SECOND THIRD VILLAGE PIPRAHRI BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_4]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN NARI BAZAR BANSHI DERA VILLAGE NARI BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_6]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN SECOND VILLAGE BICHWAHI BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_5]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN VILLAGE NARI FIRST BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_2]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[CONSTRUCTION OF ANGANBADI KENDRA IN SECOND VILLAGE NARI BLOCK TINDWARI] [755/ANKIK/2026-27 dt 27-07-2026][2026_RDUP_1172948_3]
Commissioner Rural Development UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 11:00 AM |
|
[Meera Reti chaurahe par pink Shauchalaya se sinchai Vibhag ke Nale ki Puliya Tak dono Taraf side patri par interlocking tiles Nirman evam nala marmmat karya ] [1668/NPP/GARH-nivida nirman/2026-27 date. 27-07-2026][2026_DOLBU_1172966_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 12:00 PM |
|
[ward number 06 evam ward number 02 ke Madhay munshif Aawas Ke Samne se Bhagwat ke Godam Hote Hue Sake wali tubewell Tak CC road Nirman evam nala marmmat Karya] [1668/NPP/GARH-nivida nirman/2026-27 date. 27-07-2026][2026_DOLBU_1172966_2]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 12:00 PM |
|
[Construction of 2x40 MVA UPEIDA (IMLC) Sambhal on turnkey basis against tender specn. No ESD-680] [ESD-680][2026_PTRCL_1173679_1]
U.P. Power Transmission Corporation Ltd.
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 12:30 PM |
|
[Nagar palika parishad auraiya ke gata n0 294/1 kothi panch kapash ki bhumi per vaishvik nagar bazar ka nirman karya ] [749/N.P.P.N.V./2026-27 date 25.07.2026][2026_DOLBU_1174073_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
29 Aug 2026, 02:00 PM |
|
[RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh] [CE-RO/LKO/NH-330B (Gonda Bypass)/2025-26 Dated.16.06.2026][2026_MoRTH_913353_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 11:00 AM |
|
[Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.] [RW/NH12014/163/2024/GJ/Zone-V][2026_MoRTH_908658_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 11:00 AM |
|
[Construction, Renovation, modernization, and beautification of the Cremation Ground in moh Rajeev Nagar.] [322/NPPP/ASVY/E-Tender/2026-27][2026_DOLBU_1173017_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
31 Aug 2026, 11:00 AM |
|
[ Construction of Tel Bridge with approaches at Km 126.744 of NH-26 in the state of Odisha on EPC mode] [12 CE NH of 2025-26][2026_MoRTH_900192_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 12:00 PM |
|
[REPLACEMENT OF DAMAGED GASKET OF 40MVA TRANSFORMER-2ND (GEC ALSTOM MAKE, MFY. 1997) AND OTHER M and R WORK ] [E-Tender No. 22/2026-27/ETC-I/VNS][2026_UPTCL_1173859_1]
UP Power Transmission Corp.Ltd (Operation)
|
UPPCL |
electrical |
UP eTender |
β |
31 Aug 2026, 12:00 PM |
|
[Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode ] [13 CE NH of 2025-26][2026_MoRTH_900209_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 12:00 PM |
|
[Procurement of Material for 220KV Switchyard EMD-I, CTPS HTPS Kasimpur] [ET-07/MMC/PD-I/HTPS/2026][2026_RVUNL_1173059_1]
UP Rajya Vidyut Utpadan Nigam Ltd
|
UPPCL |
supplyelectrical |
UP eTender |
β |
31 Aug 2026, 02:00 PM |
|
[Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode] [RW/PAT/NH133E/Bhaglpur73/22-23][2023_MoRTH_771865_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 04:00 PM |
|
[Const. of RCC Retaining and Security Wall, Security Hut, Security gate, culvert and Other related civil works at 132/33 kV S/S Jhansi II. (Annex-A) Const. of Residences (01 No. Type 3 and 2 no. Type 2) at 132 KV S/S Jhansi-II. (Annex-B)] [E-Notice No. 13/ECTCJ/2026-27][2026_UPCTL_1174141_1]
UP Power Transmission Corp.Ltd (Works and Projects))
|
UPPCL |
constructionelectrical |
UP eTender |
Rs. 0 |
31 Aug 2026, 04:00 PM |
|
[Supply and installation work] [934/NPPLONI/ETENDER/2026-27][2026_DOLBU_1173671_4]
Directorate of Local Bodies UP
|
β |
supply |
UP eTender |
β |
31 Aug 2026, 05:00 PM |
|
[Supply and installation work] [934/NPPLONI/ETENDER/2026-27][2026_DOLBU_1173671_1]
Directorate of Local Bodies UP
|
β |
supply |
UP eTender |
β |
31 Aug 2026, 05:00 PM |
|
[Supply and installation work] [934/NPPLONI/ETENDER/2026-27][2026_DOLBU_1173671_3]
Directorate of Local Bodies UP
|
β |
supply |
UP eTender |
β |
31 Aug 2026, 05:00 PM |
|
[Consultancy Services for Feasibility Study and Preparation of Detailed Project Report (DPR) Widening to 4L road of Barpalli- Balangir -Kesinga Bhawanipatna -Junagarh on NH-26 from 21/000 to 202/000 km excluding Bhawanipatna bypass in state of Odisha] [RO/BBSR/DPR/NH-26/ Barpalli -Junagarh-02-2nd call][2026_MoRTH_917634_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 05:00 PM |
|
[Supply and installation work] [934/NPPLONI/ETENDER/2026-27][2026_DOLBU_1173671_2]
Directorate of Local Bodies UP
|
β |
supply |
UP eTender |
β |
31 Aug 2026, 05:00 PM |
|
[Consultancy Services for Feasibility Study and Preparation of Detailed Project Report Widening and strengthening of Existing 2L to 2L PS from Km 40/00 to 68/600Km (Podamari to Mohana) of NH-326 and from km 0/00 to km 102/900 (Moh to Par) of NH 326A ] [RO/BBSR/DPR/NH-326 and NH 326A/Pod-Moh-Para/26-27][2026_MoRTH_917643_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
31 Aug 2026, 05:00 PM |
|
[Construction Work] [931/NPPLONI/ETENDER/2026-27][2026_DOLBU_1173689_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
31 Aug 2026, 05:00 PM |
|
[07 - Ward no. 27 Mohalla Chainapuri mein fatak ke paas Iqbal wali gali va Aabid wali gali mein naali va interlocking tiles sadak nirman ka karya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_7]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[03 - Garh Gate police chauki se lekar Gooli Chowk hote hue Sikandar Gate tak hotmix sadak nirman karya.] [228/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173704_3]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[01 - Ward No. 05 Mo. Indragarhi mein Satish Kumar ke makaan se Devendra ke makaan ki aas-paas ki galiyon mein naali va interlocking sadak nirman karya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[04 - Ward no. 14 mo. Prempura ki galiyon mein naali va interlocking tiles sadak nirmaan ka kaarya.] [228/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173704_4]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[03 - Ward no. 11,Garh Road par flyover ke neeche fatak ke paas se lekar police chowki tak RCC nala nirman ka karya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_3]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[04 - Ward no. 18 Mo. Chamri me Ramu ke makaan se lekar Imran ke makaan ke aas-paas ki galiyon me naali va interlocking tiles sadak nirmaan karya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_4]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[02 - Ward no. 39 Mohalla Majidpura mein zero (0) number gali mein Inkram Qureshi va Eidgah road tak naali va interlocking sadak nirman karya.] [228/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173704_2]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[05 - Ward no. 20, Mohalla Ramgarhi mein Rahmat Masjid se lekar Salauddin ke makan tak naali wa interlocking tiles sadak nirmaan ka karya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_5]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[01 - Ward no. 35 New Shivpuri mein Rameshchand Anoja se Chaudhary Amarjeet ke makaan tak, Surjeet ke makaan se Deepak Tyagi tak evam Rakesh Tiwari ke makaan se Ramkishan Garg ke makaan tak gali mein naali va interlocking sadak nirmaan kaary.] [228/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173704_1]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[06 - Ward no. 26 Mohalla Sarvodaya Colony mein Shivdatt Sharma se lekar Lokend Tyagi v Vijay ke makaan tak naali v interlocking tiles sadak nirmaan ka kaarya.] [226/23/PWD/2026-27 Dt. 29-07-2026][2026_DOLBU_1173696_6]
Directorate of Local Bodies UP
|
β |
construction |
UP eTender |
β |
01 Sep 2026, 12:00 PM |
|
[Widening and strengthening of stretch from Hansdiha (Design Ch 92.380 km) to Chopa More (Design km 129.370) of NH-133 to 4 lane with paved shoulder in the State of Jharkhand under EPC mode] [RW/PIU/Dhanbad/bid/NH133][2026_MoRTH_917487_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
01 Sep 2026, 05:00 PM |
|
[Consultancy Services for Preparation of Detailed Project Report for Upgradation of 2 lane to 4 lane with Paved Shoulder for Raipur km 0 to Sarangarh km 186800 of NH130B in the state of Chhattisgarh] [RW/RO/CG/DPR/NH-130B/2nd][2026_MoRTH_912427_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
01 Sep 2026, 05:00 PM |
|
[Upgradation to Two lane with paved shoulder of Porbandar Bhanvad Jamjodhpur Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat on HAM. ] [RW/NH-12014/165/2024/GJ/Zone-V][2026_MoRTH_902671_1]
Ministry of Road Transport and Highways
|
β |
construction |
eProcure |
β |
02 Sep 2026, 11:00 AM |